Process

Curate your selection

Export your schedule

Enquire with our team

Filters
Search the site
Did you mean ?
Melbourne
Playford Health Hub
Projects

Playford Health Hub

  • Location

    40 & 44 John Rice Ave, Elizabeth Vale

  • Completed

    March 2024

  • Architect

    Woods Bagot

  • Area

    8,700sqm

  • Type

    Construction, Fitout

  • Project Manager

    Place PM

  • Value

    $20M+

  • Delivery Method

    Design & Construct

  • Sectors

    Health and Aged Care

The Playford Health Hub was more than just another healthcare project; it was an opportunity to help shape the future of medical infrastructure in South Australia. Delivered by Schiavello Construction as Stage 2 of the landmark $51 million development, the project brought together innovation, sustainability and technical precision to create a next-generation health precinct for the growing northern suburbs, reinforcing Schiavello Construction’s growing presence in the healthcare sector across South Australia.

Developed by NorthWest Healthcare Properties Australia and Vital Healthcare Property Trust, the three-storey facility was designed as a high-tech, interconnected medical hub powered entirely by renewable energy. As South Australia’s first registered 6-Star Green Star Medical Office Building, the project set a new benchmark for environmentally sustainable healthcare design.

 

Left Image
Right Image

Technical expertise below ground

One of the project’s most technically challenging components was the construction of the basement, extending approximately six metres below ground level. The basement structure incorporated CFA piling extending to depths of 15 metres. Working closely with Belpile, our team undertook detailed Design & Construct analysis to optimise pile spacing efficiencies while ensuring structural integrity and compliance with the project’s loading criteria.

Although groundwater was not encountered within the basement excavation, our project team implemented a robust waterproofing strategy to future-proof the structure. Full vertical strip drainage, plastic face membranes and Xypex shotcrete applications were installed to the piled walls, delivering long-term protection and durability to the basement envelope.

Left Image
Right Image

A lasting investment in community healthcare

Today, the completed Playford Health Hub stands as a state-of-the-art healthcare destination accommodating a range of leading medical providers, including Calvary Health Care, GenesisCare, Clinpath Pathology and RadiologySA, alongside GP consulting suites and supporting retail tenancies.

For our team, the Playford Health Hub was more than the delivery of a highly technical building. It was the opportunity to contribute to a future-focused healthcare environment that will support the needs of patients, practitioners and the wider community for years to come.

Full Width Image
Full Width Image
Full Width Image
Full Width Image

Subscribe to our E-News